Roatan Mission Blog

Roatan 2024 - 3/21

Today was a blessed day!
  • Varnishing ceiling boards continued. They finished all the large boards and will start to install some tomorrow.
  • Finishing touches on the team room now occupied by Heather and a bunch of younger girls.
  • Drywall and mudding began in the apartment.
  • Floor joist all set and level hope to finish flooring tomorrow and start framing walls.
  • More door locks installed.
  • Fill dirt for drainage control is making great headway.

Prayers were answered when a short downpour revealed low spot and helped to show the way the water will run.

Dinner was delayed in lieu of a sunset swim off the dock.









Blog Sidebar

Sidebar content for the blog.

Top